Building the Future of Our Coastlines
2025 - 2026

Australian Grand Prix Floating Pontoon Walkway

Maw Civil Marine was engaged to deliver a temporary floating pontoon walkway across Albert Park Lake, providing safe and compliant pedestrian access for the Australian Grand Prix event.
Client
Marine Structure and Australian Grand Prix Corporation
Location
Albert Park Lake, Victoria
Project Type
Event Infrastructure & Marine Installation
Price Category
$500k - 1m
Year
2025 - 2026

About The Project

Maw Civil Marine was engaged to supply, install, and later deconstruct a temporary floating pontoon walkway across Albert Park Lake for the Australian Grand Prix. The structure included four gangways and full-length safety railings, providing pedestrian access across the lake during the event.

The installation involved setting concrete anchor blocks to secure the pontoon system, using a crane and barge to transport and position materials efficiently across the water. All works were carefully planned around event timelines and environmental requirements, ensuring minimal disruption to the lake environment.

Scheduled for staged delivery, the concrete anchor installation will be completed in October 2025, with full pontoon assembly and deconstruction to occur during the 2026 event period.

Enquire Now To Start Your Project

Speak with our expert team about scope, timelines and delivery for your marine or coastal works.

Our Projects